Mark-1 Cryostat Status Report Q1 and Q2, FY03

T. Bernát

2003Engineering被引 2开放获取

下载 PDF 全文出版方页面 →

摘要

The Mark 1 now has a completion date goal of mid-FY05 . The original concept for the Mark-1 cryogenics was based upon a liquid helium (LHe) reservoir, which was developed in collaboration with a group of cryogenic experts from Commissariat a L'Energie Atomique (CEA) in France. This concept meets all requirements and a conceptual design review was held in November 2002. However, meeting the completion date goal would be very difficult with this approach. Subsequent interaction with colleagues at the University of Rochester Laboratory for Laser Energetics (URLLE) generated a modified concept with the LHe cryogenics replaced with a commercial mechanical cryo-cooler. This offers ease of operation, reduced cost, and a shorter schedule. However, some functional requirements cannot be met, and change requests are being written for review and acceptance. A high-level schedule for the cryo-cooler-based Mark-1 has been created, with a more detailed plan for the risk reduction and concept/component testing phase, which extends into the first half of FY04. A complete detailed schedule is in preparation.

引用本文(GB/T 7714)

T. Bernát. Mark-1 Cryostat Status Report Q1 and Q2, FY03[J]. 未知来源, 2003.

引文网络

参考文献与被引分析加载中…

DOI:https://doi.org/10.2172/15005144

本站仅收录题录与摘要供学习参考,全文版权归属出版方;如有侵权请联系我们删除。