首页 / 资料库 / 文献详情

Study on constant outflow model for reservoir flood control operation and its application

Senlin CHENYawen ZHANGD D Li

2021DOAJ (DOAJ: Directory of Open Access Journals)Engineering被引 1开放获取

出版方页面 →

摘要

There are some problems in the current mathematical model of the optimal operation of reservoir floods, such as continuous adjustments of the discharge gate and sudden change in discharge between time periods. In response to these problems, the model of the optimal operation of reservoir flood control is divided into the instantaneous outflow model and the constant outflow model. In a basic flood control system consisting of a reservoir and a flood control station, with a constant outflow rate considered the decision variable, a compensative reservoir flood control regulation is developed through the confluence curve of the Yangtze Water Resources Commission; this system can meet the requirements of refinement and safety. Compared with the instantaneous outflow model, the results of the constant outflow model show that the flood storage capacity decreased by 0.05%—0.18%, while the maximum discharge shows the behavior of both increasing and decreasing, indicating that the constant outflow model is not inferior to the instantaneous outflow model. At the same time, the results reveal that the regulation of secondary compensation reduces the flood control storage capacity by 10.6% compared with that obtained with the equal-storage operation model; this result provides a new method for determining the flood control storage capacity of a reservoir.

引用本文(GB/T 7714)

Senlin CHEN, Yawen ZHANG, D D Li. Study on constant outflow model for reservoir flood control operation and its application[J]. DOAJ (DOAJ: Directory of Open Access Journals), 2021.

引文网络

参考文献与被引分析加载中…

DOI:https://doi.org/10.14042/j.cnki.32.1309.2021.05.004

本站仅收录题录与摘要供学习参考,全文版权归属出版方;如有侵权请联系我们删除。