首页 / 资料库 / 文献详情

Analisis Volume LNG Ideal untuk Cooling Down Fasilitas LNG Hub

Dhian NugrahaHarunsyah HarunsyahMunawar Munawar

2023Jurnal TeknologiEngineering被引 1开放获取

下载 PDF 全文出版方页面 →

摘要

The LNG Receiving Hub facility is an existing facility that has not been used for a long time. In order for this facility can be used again, all equipment and piping systems must first be conditioned to a temperature close to the operational temperature of LNG, which is -160 o C. The purpose of this approach is to determine the theoretical and actual volume of LNG used for the cooling down process of the LNG Hub facility, as well as to compare it with the cooling down process for the regasification facility. An analytical approach is used in this study to determine the ideal amount of LNG needed for cooling down the facility and compare it with the actual amount of LNG that is being used for cooling down the facility. From the results of the analysis, the theoretical LNG volume needed for cooling down the LNG Hub facility is 8,176 m 3 and the actual volume is 7,013.6620 m 3 , while the actual value for cooling down the regasification facility is 11,573.19 m 3 . The actual volume for the LNG Hub facility is smaller compared to regasification which can be caused by the smaller volume of pipelines and the difference in the cooling down mechanism in both facilities.

引用本文(GB/T 7714)

Dhian Nugraha, Harunsyah Harunsyah, Munawar Munawar. Analisis Volume LNG Ideal untuk Cooling Down Fasilitas LNG Hub[J]. Jurnal Teknologi, 2023.

引文网络

参考文献与被引分析加载中…

DOI:https://doi.org/10.30811/teknologi.v23i1.3687

本站仅收录题录与摘要供学习参考,全文版权归属出版方;如有侵权请联系我们删除。