Slurry Trench Construction—Collier Road Landfill

Wayne R. BergstromMark B. SweatmanMatthew E. Dodt

1987Environmental Science被引 1

出版方页面 →

摘要

The owner of an existing solid waste landfill has undertaken several measures to contain and recover near-surface groundwater at the site, including capping of the site with cohesive soil, the installation of a major subsurface drain, and the construction of a perimeter slurry trench groundwater barrier. Construction monitoring of this slurry trench barrier has provided a large amount of quality control/assurance data which, when combined with other construction observations, has yielded a number of important construction-related lessons to be applied in similar projects. Monitoring of the slurry trench performance since construction indicates that the slurry trench and related construction features have very quickly proven to be beneficial at this previously uncontrolled waste disposal site.

引用本文(GB/T 7714)

Wayne R. Bergstrom, Mark B. Sweatman, Matthew E. Dodt. Slurry Trench Construction—Collier Road Landfill[J]. 未知来源, 1987.

引文网络

参考文献与被引分析加载中…

本站仅收录题录与摘要供学习参考,全文版权归属出版方;如有侵权请联系我们删除。