首页 / 资料库 / 文献详情

Sediment balances in the Blue Nile River Basin

DA Delft

2014Agricultural and Biological Sciences被引 2

出版方页面 →

摘要

Rapid population growth in the upper Blue Nile basin has led to fast land-use changes from natural forest to agricultural land.This resulted in speeding up the soil erosion process in the highlands and increasing sedimentation further downstream in reservoirs and irrigation canals.At present,several dams are planned across the Blue Nile River in Ethiopia and the Grand Ethiopian Renaissance Dam is currently under construction near the border with Sudan.This will be the largest hydroelectric power plant in Africa.The objective of this paper is to quantify the river flows and sediment loads along the Blue Nile River network.The Soil and Water Assessment Tool was used to estimate the water flows from un-gauged sub-basins.To assess model performance,the estimated sediment loads were compared to the measured ones at selected locations.For the gauged sub-basins,water flows and sediment loads were derived from the available flow and sediment data.To fill in knowledge gaps,this study included a field survey in which new data on suspended solids and flow discharge were collected along the Blue Nile and on a number of tributaries.The comparison between the results of this study and previous estimates of the sediment load of the Blue Nile River at El Deim,near the Ethiopian Sudanese border,show that the sediment budgets have the right order of magnitude,although some uncertainties remain.This gives confidence in the results of this study providing the first sediment balance of the entire Blue Nile catchment at the sub-basin scale.

引用本文(GB/T 7714)

DA Delft. Sediment balances in the Blue Nile River Basin[J]. 未知来源, 2014.

引文网络

参考文献与被引分析加载中…

本站仅收录题录与摘要供学习参考,全文版权归属出版方;如有侵权请联系我们删除。