首页 / 资料库 / 文献详情

Retrofit baseload LNG plants

Chen‐Hwa ChiuLawrence K Murray

1992Hydrocarbon processingEnvironmental Science被引 2

出版方页面 →

摘要

This paper reports on significant economic savings which result from revamp strategies that start with identification of objectives and constraints, followed by and evaluation of alternatives and an implementation of selected tasks. Several years after the startup of a baseload LNG plant, improving existing production trains or adding new trains to increase production capacity are usually under consideration. The main objective is to maximize net LNG delivered to tankers and increase plant reliability and safety. Constraints are usually manifested as equipment bottlenecks, storage capacity limitations or regulatory requirements. A well-planned performance test, along with plant simulations, is needed to locate hidden bottleneck.

引用本文(GB/T 7714)

Chen‐Hwa Chiu, Lawrence K Murray. Retrofit baseload LNG plants[J]. Hydrocarbon processing, 1992.

引文网络

参考文献与被引分析加载中…

本站仅收录题录与摘要供学习参考,全文版权归属出版方;如有侵权请联系我们删除。